Renovation consent: where to start

Before committing to a renovation layout, find out which parts need council input and which may be exempt from building consent. The answer depends on the work, not simply the room’s name. Start with a written scope and ask the relevant professionals to confirm the route for your property.

Timber structure during construction
From the Fix All Construction project gallery.

Separate the approval questions

Building consent and resource consent address different matters. MBIE explains that even exempt building work must meet the Building Code, and local planning requirements can still apply. For a Wellington-region property, identify the council responsible for its address before relying on advice about another district.

Turn an idea into a consent discussion

Proposed workQuestion to resolveInformation to bring
Changing an internal wallDoes it support loads, brace the building or have another protected function?Existing plans and the proposed opening.
Changing a bathroomAre fixtures being relocated or added, and what else changes?Existing and proposed fixture layouts.
Adding space or altering the exteriorWhat design and approvals are needed for the complete scope?Site plan, elevations and earlier approval records.
Building outdoorsDo fall heights, boundaries or planning controls affect the proposal?Site levels, dimensions and the proposed location.

Your first approval checklist

  1. Write a room-by-room description of the proposed changes.
  2. Label drawings as existing or proposed, with a date.
  3. Find any consent and completion records already held.
  4. Ask who will obtain any additional property information.
  5. Record who confirms consent needs and who submits an application.

Changing a kitchen can involve several decisions

Replacing cabinets, moving a sink and opening an adjoining wall are separate parts of one project. Do not assume a single answer about “a kitchen renovation” covers them all. Give the council and relevant professionals the complete scope so related work is considered together.

Does an exemption mean there are no requirements?

No. An exemption from building consent is not an exemption from the Building Code or every other rule. MBIE’s guidance is general, so get project-specific advice when the conditions are unclear. Keep the advice and the final scope together in your project records.

Further reading

Guidance checked 30 September 2026. Confirm the requirements and product information for your own project.

Let’s get it sorted.

Tell us about your property, the work you have in mind and where your plans have reached. Request a quote discussion or a site visit through our enquiry form.

Discuss your renovation plans
Isaac021 084 52766Aston020 4116 5638

Wellington, the Hutt Valley, Porirua and the Kāpiti Coast