Your kitchen renovation checklist

A kitchen renovation brings several packages together in one room. The useful checklist is the one that makes their handovers clear: drawings, appliances, building work, service connections and finishing. Use this guide before discussing your kitchen project with Fix All.

Compact kitchen with white cabinetry, pale timber flooring and a tiled splashback
From the Fix All Construction project gallery.

Give everyone the same information

Keep one current layout drawing and one appliance schedule. When a selection changes, update the record and tell the people affected. A different fridge, sink or cooktop may alter more than the cabinet beside it. Confirm who coordinates information between the kitchen supplier, builder and relevant trades before orders are final.

Kitchen responsibility checklist

Before this stageHave this readyAgree who checks it
Finalising the layoutRoom measurements, existing services and proposed wall changes.The designer, supplier and builder’s responsibilities.
Ordering joineryAppliance models, sink details and approved drawings.Who signs off dimensions and specification.
Preparing the roomRemoval, wall and floor work, and trade locations.What must be ready before installation.
Installing the kitchenDelivery access, storage and an agreed installation sequence.Who coordinates supplier and trade visits.
Finishing and handoverSplashback, paint, connections and a remaining-items list.Who checks completion and supplies care information.

Prepare the household as well as the room

  1. Decide where food, utensils and small appliances will be stored.
  2. Agree a practical temporary food-preparation area away from the work.
  3. Clear the delivery route and identify secure storage for new items.
  4. Record retained appliances and who will move or disconnect them.
  5. Ask when key decisions are due and how changes are approved.

An appliance change has a chain of effects

If you change from the agreed fridge to a wider model, do more than update a shopping list. Ask the kitchen supplier to confirm the opening, door movement and surrounding joinery. Let the team know before manufacturing or room preparation depends on the earlier dimensions.

Can I leave splashback selection until later?

Ask which decisions affect preparation, measurements or scheduling. You may have time to choose some finishes later, but the team needs to know what it is preparing for. Record a decision date instead of leaving an item indefinitely undecided.

Further reading

Guidance checked 30 September 2026. Confirm the requirements and product information for your own project.

Let’s get it sorted.

Tell us about your property, the work you have in mind and where your plans have reached. Request a quote discussion or a site visit through our enquiry form.

Prepare your kitchen project
Isaac021 084 52766Aston020 4116 5638

Wellington, the Hutt Valley, Porirua and the Kāpiti Coast